Here is an overview of the major projects in the City of Clarence-Rockland for the year 2022.

Replacement of the watermain on Laurier Street

Description

Replacing the watermain on Laurier Street between Simoneau and Giroux Streets. Also repaving the street on its full width. 

No street closure planned. Traffic will be affected with alternating from one lane to the other in some areas of the project.

Approximate dates of work

  • Work between Simoneau and Pouliotte scheduled to be completed by Nov. ’22.
  • Work between Giroux and Gareau scheduled to be reported to May ’23 and be completed by July ’23.
  • Paving of full length and width from Giroux to Simoneau to take place next summer.

Approved Budget

$2,140,000

Contact

Charles Bonneau

cbonneau@clarence-rockland.com

Map of replacement of the water system on Laurier Street

 

Reconstruction of Edwards Street

Description

Continuation of 2021 work.

  • Storm sewer replacement between Albert and Victoria Streets.
  • Repair of some sidewalk panels.
  • Repaving of the street between Laurier and County Road 17 (full width)
  • Partial street closure between Albert and Victoria streets for the duration of the project. This area will be open to local residents only.

Approximate dates of work

All dates are tentative and weather dependant

  • Paving between Laurier and Albert scheduled approximately on Aug. 31st.
  • Edwards Street will be completely closed from Laurier Street to County Road 17 for approximately 1 week to complete the paving and line painting.
  • Road scheduled to be re-opened immediately after line painting completed on approximately Sept 16th.

Approved Budget

$1,680,000

Contact

Charles Bonneau

cbonneau@clarence-rockland.com

 Map of work location for the Edwards Street project

Yves Street Corrective Roadwork - Completed

Description

Remedial road work on Yves Street
-Intermittent work and no complete street closure is planned during the work.

Approximate dates of work

May to June 2022

Approved Budget

$332,500

Contact

Alain Beaulieu

abeaulieu@clarence-rockland.com

Map of Yves Street work location

 

Removal of Clarence-Rockland Arena Entrance

Description

Removal of the Clarence-Rockland Arena Entrance

Traffic on County Road 17 will not be affected

Approximate dates of work

June to August 2022

Approved Budget

$100,000

Contact

Alain Beaulieu

abeaulieu@clarence-rockland.com

Map of location for the removal of the entrance at the Clarence-Rockland Arena

Repaving - Various Streets

Description

Repaving of the following streets

  • Laporte Street (from Laurier to Sylvain) - Completed
  • Léonard Street - scheduled to be paved during the week of August 22nd
  • Léonard Place - scheduled to be paved during the week of August 22nd
  • St-Anne Street - 
  • Francoise Street - scheduled to be paved during the week of August 22nd
  • Potvin Avenue - scheduled to be paved during the week of August 22nd
  • Caron Street (from David to Baseline)
    • 3 culverts to be replaced in August
    • 4 km of ditch work to be done in August and September
    • Paving scheduled for late September
  • Fairway Street - Completed
  • Clubhouse Street - Completed
  • Eagle Street - Completed
  • Robert Street - (between Michel and Yves Streets), paving scheduled for October
  • Agathe Street - paving scheduled for late September
  • Wolfe Street - paving scheduled for late September

No street closures expected. Traffic will be slightly affected.

Approximate dates of work

June to September 2022

Approved Budget

$1,270,000

Contact

Alain Beaulieu

abeaulieu@clarence-rockland.com

Map of location of paving on numerous streets in Rockland

 

Waste Water Treatment Plant Upgrade

Description

  • Upgrades to the wastewater treatment plant to increase capacity and eliminate odours.
  • Traffic will not be affected.

Approximate dates of work

2020 to October 2022

Approved Budget

$22,000,000

Contact

Philippe Cormier

pcormier@clarence-rockland.com

Map of location for wastewater treatment plant upgrade

 

Watermain Relining on St-Anne and Charron Streets

Description

  • Relining of the watermain on St-Anne and Charron streets (from Raymond to St-Denis).

  • Traffic will be slightly affected.

Approximate dates of work

July to September 2022

Approved Budget

$475,000

Contact

Alain Beaulieu

abeaulieu@clarence-rockland.com

Map of work location on St-Anne and Charron Streets

Laurier Street Culvert Replacement and Road Realignment

Description

  • Replacement of a culvert at Lafontaine Creek.
  • Realignment of the curve immediately south of the culvert.
  • Installation of a new pedestrian crossing (with signage) at 2935 Laurier.
  • Complete closure of the street will be necessary for the duration of the work.

Approximate dates of work

  • Road scheduled to reopen by September 23rd
  • Work scheduled to be completed by October 14th

Approved Budget

$475,000

Contact

Alain Beaulieu

abeaulieu@clarence-rockland.com

Map of location of Laurier Street Culvert Realignment

Culvert Replacement on Chamberland Street - Completed

Description

  • Replacement of a culvert at 2799 Chamberland.

  • Complete closure of the street will be necessary for the duration
    of the work.

Approximate dates of work

June to July 2022

Approved Budget

$590,000

Contact

Charles Bonneau

cbonneau@clarence-rockland.com

Map of location for culvert replacement on Chamberland Street

Various Repairs on Cobbs Lake Bridge

Description

  • Various repairs on Cobbs Lake Bridge (on Lalonde Road).
  • Intermittent work and complete road closure will be required during certain stages of the work.

Approximate dates of work

October 3 to 31st 2022

Approved Budget

$51,000

Contact

Alain Beaulieu

abeaulieu@clarence-rockland.com

Map of location for Cobbs Lake Bridge work

Culvert Replacement on Canaan Road

Description

  • Replacement of a culvert at 3473 ch. Canaan (Work in conjunction with the City of Ottawa)
  • Complete road closure will be required during the duration of the duration of the work.

Approximate dates of work

August 8-26 2022

Approved Budget

$150,000

Contact

Alain Beaulieu

abeaulieu@clarence-rockland.com

Map for Canaan Road culvert replacement

Renovations - Bourget Library Washrooms

Description

  • Renovations to make accessible the Bourget Library washrooms

Approximate dates of work

Date to be confirmed

Approved Budget

$23,400

Contact

Charles Bonneau

cbonneau@clarence-rockland.com

Bourget Library

Renovations at the Bourget Community Centre

Description

  • Renovations to make accessible the Bourget Community Centre

Approximate dates of work

Dates to be confirmed

Approved Budget

$145,000

Contact

Charles Bonneau

cbonneau@clarence-rockland.com

Bourget Community Centre