If you are planning to do some construction work, find out before you start whether a building permit is required.

Pay my Building Permit online

Before you start

Before you begin the process, check with the Planning Department to make sure your project is compliant. Issuing a building permit can take several weeks, depending on the complexity of the project. It is therefore a good practice to plan your project in advance.

In order to obtain a Building Permit, the application form must be completed and submitted with all required documents. This application can be emailed to construction@clarence-rockland.com or submitted in person at City Hall at 1560 Laurier Street, Rockland, during regular business hours.

A lot elevation plan may be required for an application for a detached garage, shed or pool permit.

 

 Practical Guides

 Guide for Adding a Second Unit to an Existing Home

Guide for Adding a Second Unit to an Existing Home (Ministry of Municipal Affairs and Housing)

 
Guide to Building a Garage 
Ensure you meet all the zoning requirements prior to submitting your permit application. You may contact the Planning department for a request of information by completing the General Inquiry Form.

Application forms :

  • Completed application for a Permit to Construct or Demolish; available on our web site.
  • Completed Schedule 1: Designer information;
  • Site plan showing location of new structure, existing structures, septic system and well location if applicable. Dimensions are required from proposed structure to property lines;
  • Letter of authorization by owner (if applicant is not the owner).

Drawings and requirements :

  • The homeowner or a qualified BCIN designer can produce the required drawings;
  • The drawings must be to scale;
  • Foundation or slab plans; If slab exceed 592 sq. ft. (55 m²) an Ontario Professional Engineer Design is Required;
  • Plans showing location of openings (doors and windows) and direction of trusses;
  • Elevations plans showing finishes;
    • Cross section plans showing composition of floor, walls and roof;
    • Plans shall show all structural elements

Building permits fees (2020 fees)

  • 153.00$ for the first 300 sq.ft. and 0.40$ per additional square feet;
  • 100.00$ or 500.00$ performance deposit (100$ deposit for less than 25 000$ of project value and 500$ for project value between 25 000$ to 100 000$);
  • Performance deposit is returned in full if all proper inspections are approved and documents provided within the first year, 25% is retained for every year of non-compliance.

Documents required to close file:

  • Final electrical report (Electrical safety authority) 1-877-372-7233 (if applicable).

The above information is for general purpose, some requirements may vary depending on the project.

If you require additional information, please contact the Building division at 613-446-6022 ext.2254 or by email at construction@clarence-rockland.com

Garage Building Guide Diagram Engineer Drawings

Guide to Building a Deck 

Ensure you meet all the zoning requirements prior to submitting your permit application. You may contact the Planning department for a request of information by completing the General Inquiry Form.

Application forms :

  • Completed application for a Permit to Construct or Demolish; available on our web site.
  • Completed Schedule 1: Designer information;
  • Site plan showing location of new deck, existing structures, septic system and well location if applicable. Dimensions are required from proposed structure to property lines;
  • Letter of authorization by owner (if applicant not the owner)

Drawings and requirements :

  • The homeowner or a qualified BCIN designer can produce the required drawings;
  • The drawings must be to scale;
  • Foundation / Footing plans; showing anchorage of structure and spans;
  • Plans showing beams, joists, posts, sizes and spans.
  • Elevations plans showing deck height, railing specs and finishes;
  • Cross section plans showing all structural details.

Building permit fees : (2020 fees)

  • 153.00$ for the first 300sq.ft. and 0.40$ per additional square feet;
  • 100.00$ or 500.00$ performance deposit (100$ deposit for less than 25 000$ of project value and 500$ for project value between 25 000$ to 100 000$);
  • Performance deposit is returned in full when all proper inspections are approved, and documents provided within the first year, 25% is retained for every year of non-compliance.

The above information is for general purpose, some requirements may vary depending on the project.

If you require additional information, please contact the Building division at 613-446-6022 ext. 2254 or by email at construction@clarence-rockland.com

Deck Application Guideline Drawing Engineering Drawing

 
Guide to Building an Accessory Apartment 

Ensure you meet all the zoning requirements prior to submitting your permit application.

You may contact the Planning department for a request of information by completing the General Inquiry Form.

Application form :

  • Completed application for a Permit to Construct or Demolish; available on our web site.
  • Completed Schedule 1: Designer information;
  • South Nation Conservation letter for Septic System, 1-877-984-2948 (if applicable);
  • Letter of authorization by owner (if applicant is not the owner).

Drawings and requirements:

  • The homeowner or a qualified BCIN designer can produce the required drawings;
  • The drawings must be to scale;
  • All exits, smoke alarms/carbon monoxide locations;
  • Fire separations including the rating of the construction;
  • The size of the existing dwelling and proposed accessory apartment;
    • The complete dimensions and location of all windows and doors (existing and new);
    • The size of all the rooms of the accessory apartment;
    • The type of heating system for the existing dwelling and accessory apartment (needs to be separate heating system);
    • Location of all plumbing fixtures (sinks, toilet, shower…);
    • Proper fire donuts on all plumbing going into fire separation;
    • A proper shut-out valve on main water line inside the new accessory apartment.

Building permits fees (2020 fees)

  • 638.00$ for the first 750 sq.ft. and 0.75$ per additional square feet;
  • 15.30$ per plumbing fixture (sinks, toilet, shower, tub …);
  • 204.00$ for solid fuel burning appliance (if applicable);
  • 500.00$ performance deposit (returned to you, if all proper inspections are approved and documents provided within the first year, 25% is retained for every year of non-compliance);
  • 20.00$ for the recycling bins.

Documents required for Occupancy :

  • Final electrical report (Electrical safety authority) 1-877-372-7233;
  • Final septic report, if a permit was required by South Nation Conservation;
  • Ventilation report, if new forced air system was installed.

The above information is for general purpose, some requirements may vary depending on the project.

If you require additional information, please contact the Building division at 613-446-6022 ext.2254 or by email at construction@clarence-rockland.com

Guide to Building an Accessory Apartment Engineering Drawing

 
Guide to Building a Pool 

Ensure you meet all the zoning requirements prior to submitting your permit application. You may contact the Planning department for a request of information by completing the General Inquiry Form.

Application forms :

  • Completed application for a pool/spa permit; available on our web site.
  • Site plan showing location of pool/spa, existing structures, septic system and well location if applicable. Dimensions are required from proposed pool/spa to property lines;
  • Letter of authorization by owner (if applicant not the owner).

Drawings and requirements :

  • Drawings must be legible ;
  • The drawings must contain all information relating to the installation of the pool/spa (heater, filter etc.) ;
  • If a deck is attached to the pool and forms the barrier, the height of deck, details of guards and access doors are required to be shown on the drawings;
  • A separate permit is required for the deck. (the pool permit fee is waived when obtaining a deck permit for access to the pool). The deck permit fee is 153.00$ for 300 sq.ft. and 0.40$ for additional sq.ft.

 Building permit fees : (2020 fees)

  • 125.00$ for the pool/spa permit;
  • 100.00$ performance deposit ( The performance deposit is returned in full when all proper inspections are approved and documents provided within the first year, 25% is retained for every year of non-compliance).

The municipal By-law 2013-47 is the applicable regulation for the installation of a pool/spa.

The above information is for general purpose, some requirements may vary depending on the project.

If you require additional information, please contact the Building division at 613-446-6022 ext. 2254 or by email at construction@clarence-rockland.com 

Guide to Building a Pool Engineering Drawing

 

Guide to Building a Home 

Ensure you meet all the zoning requirements prior to submitting your permit application.

You may contact the Planning department for a request of information by completing the General Inquiry Form.

Application form :

  • Completed application for a Permit to Construct or Demolish; available on our web site.
  • Completed Schedule 1: Designer information;
  • Letter of authorization by owner (if applicant is not the owner).

Drawings and requirements:

  • A qualified BCIN designer can produce the required drawings;
    • The plans must be to scale and be comprised of foundation, all storeys, elevations, cross sections, details drawings;
    • SB-12 form and Hvac design;
    • Pre-engineered floor and truss plans from the manufacturer if applicable;
    • Site location plan and grading plan stamped by a Certified Surveyor or Professional Engineer;
    • The deed for the property;
    • Culvert permit if a new entrance is proposed;
    • Water connexion permit if a new service is required;
    • Septic permit if applicable (contact South Nation Conservation for this permit).

 Building permits fees (2020 fees)

  • 1479.00$ for the first 1500 sq. Ft. and 0.80$ per additional square feet for the house only;
  • 153.00$ for the first 300 sq. Ft and 0.40$ per additional square feet for an attached garage, deck, porch, finished basement;
  • 15.30$ per plumbing fixture (sinks, toilet, shower, tub …);
  • 51.00$ for each municipal connexion, water, sanitary, storm;
  • 204.00$ for solid fuel burning appliance (if applicable);
  • 1000$ to 5000$ performance deposit (returned to you, if all proper inspections and documents are approved and provided within the first year, 25% is retained for every year of non-compliance);
  • 2500.00$ for a grading deposit, an as-built plan is required for the reimbursement;
  • 941.00$ of school board development charge (may change every year);
  • 466.54$ water meter fee if applicable;
  • Development charge depends on services provide to the lot (may change every year);
  • 113.02$ civic post fee if applicable;
  • 20.00$ for the recycling bins.
The above information is for general purpose, some requirements may vary depending on the project.